<p id="p1s52"><nav id="p1s52"></nav></p><thead id="p1s52"><progress id="p1s52"></progress></thead>

    1. <wbr id="p1s52"><strike id="p1s52"><dd id="p1s52"></dd></strike></wbr>
      国产精品亚洲第一区在线,九九热在线视频观看精品,亚洲国产良家在线观看,少妇伦子伦精品无吗,亚洲一区二区三区蜜桃臀,久久伊99综合婷婷久久伊,日韩深夜免费在线观看,久久精品激情亚洲一二区
      CN EN

      NEWS

      The role of power transformers

      Power transformers are one of the main equipment for power plants and substations. The role of the transformer is not only to increase the voltage to send electricity to the electricity area, but also to reduce the voltage to the voltage used at each level to meet the needs of electricity. In short, both boost and buck must be done by a transformer. In the process of transmitting electrical energy in the power system, voltage and power losses are inevitably generated. When the same power is delivered, the voltage loss is inversely proportional to the voltage, and the power loss is inversely proportional to the square of the voltage. Using a transformer to increase the voltage reduces the loss of power transmission.
      Transformer is composed of two or more coil windings wound on the same core, the windings are connected by alternating magnetic field and work according to the principle of electromagnetic induction. The installation location of the transformer should be considered for easy operation, maintenance and transportation, and a safe and reliable place should be chosen. The rated capacity of the transformer must be reasonably selected when using the transformer. When the transformer is running at no load, a large amount of reactive power is required. These reactive powers are supplied by the power supply system. If the capacity of the transformer is too large, it not only increases the initial investment, but also makes the transformer run at no load or light load for a long time, which increases the proportion of no-load loss, reduces the power factor, and increases the network loss. This operation is neither economical nor reasonable. If the transformer capacity selection is too small, the transformer will be overloaded for a long time and the equipment will be damaged. Therefore, the rated capacity of the transformer should be selected according to the needs of the electrical load, and should not be too large or too small.
      2019/06/03 13:48:46 5673 次

      Related Documents

      Contact:Mr. YuanTel:+86-510-87846969 Fax:+86-510-87848616
      E-mail:yxwb@vip.163.comAdd:Wanshi Town Industrial Concentration Zone, Yixing City, Jiangsu
      Copy right ? 2019 Yixing Wansheng Transformer Co., Ltd.
      主站蜘蛛池模板: 免费国产综合色在线精品| 福利一区二区在线播放| 小嫩批日出水无码视频免费| 国产成人精品亚洲日本在线观看 | 精品中文字幕人妻一二| 国产美女自卫慰黄网站| 911国产自产精选| 老熟女乱了伦| 久久99精品久久久久麻豆| 国产精品久久蜜臀av| 久久久久久久久久久免费精品| 欧美日本中文| 亚洲欧美日韩成人综合一区 | av无码小缝喷白浆在线观看| 国产日韩一区二区天美麻豆| 国产精品一区中文字幕| 免费国产综合色在线精品| 国产农村老熟女乱子综合| 精品亚洲国产成人av| 国产精品久久久久久无毒不卡| 熟女av一区二区三区| 亚洲暴爽av天天爽日日碰| 亚洲精品一区二区三区在| 色偷偷中文在线天堂中文| 国产乱精品一区二区三区| 免费又大粗又爽又黄少妇毛片| 痉挛高潮喷水av无码免费| 自拍日韩亚洲一区在线| 色丁香一区二区黑人巨大| 四虎成人精品永久网站| 另类国产ts人妖合集| 亚洲综合久久一本伊一区| 国产suv精品一区二区五| 中文 在线 日韩 亚洲 欧美 | 国产在线精品国偷产拍| 中文字幕日本亚洲欧美不卡| 国产精品亚洲色婷婷99久久精品| 最近中文字幕在线视频1| 国产精品亚洲片夜色在线| A毛片终身免费观看网站| 亚洲最大福利视频网|